Campus Hills Pool Dehumidifier Replacement

Donna Maskill, Senior Project Manager  
919-560-4197, ext 21228

Location


2000 South Alston Avenue Durham, NC Map

Budget


$974,086.00  

Team Members


Architect: Durable Design
Engineer: Sigma Engineered Solutions
Landscape Consultant: Coulter Jewell Thames
Contractor: Hockaday Mechanical

Completion


November 2017

Project Description

 
Campus Hills Aquatic Center work began in the Summer of 2017. Like Edison Johnson, a new dehumidification system was installed, along with LED lighting, and painting of the interior pool natatorium space. This project was larger than Edison Johnson, with a new large concrete mechanical pad, new accessible exit ramp at the rear of the building, new interior roof drains, and improved air quality for the second floor spectator area. The project was being timed with the installation of a new roof system for the Campus Hills / I.R. Holmes Recreation Center. Previous projects had included the locker room refurbishment and the pool chemical treatment control system.