West Ellerbee Creek Trail--Phase II

Jessica Kemp, Senior Project Manager 
919-560-4197 ext. 21234 
  

Location


Westover Park at 1900 Maryland Avenue, Durham, NC 27705 Map to Broad Street near Stadium Drive Map
 

Team Members


Designer: Stewart Engineering
Construction Contractor: Fred Smith Company
Construction Engineering and Inspections: A. Morton Thomas & Associates

Project Description


This project extends the existing West Ellerbee Creek Trail 1.2 miles north connecting the trail between Westover Park and North/South Greenway on Stadium Drive. The ADA accessible trail is a 10' wide path consisting of concrete sidewalks, asphalt paths, and wooden boardwalks. Trail users are now able to travel along a previously unseen section of West Ellerbee Creek, cross major roads safely, add their own artwork to the I-85 pedestrian tunnel, and connect to the rest of Durham's existing trail network. The project was funded by federal grants and the City of Durham.

Check out the latest article from The Durham Voice about West Ellerbee Creek Trail: 
Durham's new trail will add color and connect the city by Tessa Platek.

Budget


$3,011,000.00
 

Completion


February 2018