- Home
- Departments
- Departments G-Z
- Public Works
- Construction & Design Projects: Active
- Completed/Inactive: Construction & Design Project
Completed/Inactive: Construction & Design Projects
The projects that the Public Works Department has recently completed are listed below in each of the program areas. Follow the links to the program areas to learn more about the completed projects.
9
2
1
3
-
New Sidewalk & Trail Construction
- 2012 American Tobacco Trail & Bridge (SW-24)
- 2010 Sidewalk Construction & Repairs (SW-25)
- 2011 New Sidewalk Construction (SW-26)
- 2013 Bicycle & Pedestrian Facilities (SW-31)
- 2013 Dearborn Bridge Construction (SW-32)
- 2013 Garrett Road Sidewalk Construction (SW-33)
- 2015/2013 Sidewalk Construction (SW-28)
- 2013 Sidewalk Repairs & Curb Ramps (SW-29)
- 2015 Sidewalk Repairs (SW-38)
- 2015 Sidewalk Construction Administration (SW-38C)
- 2017 NC-55 Sidewalk (SW-42)
- RFQ to provide Project Mgmt Services (SW-49c)
- RFLOI for Bike/Ped Design Services (SW-58)
- 2017 Sidewalk Repairs (SW-60)
- 2017 Bike+Walk Sidewalk Gaps (SW-64)
- 2018 Brick Paver Repairs (ST-266)
- RFLOI for CEI Service for SW-27
- SW-27 Fayetteville Street Roadway and Sidewalk
- NC 54 NC 751 Sidewalk Construction (SW-30)
- RFLOI for CEI Services NC 54 NC 751 Sidewalk SW-30
- Avondale Avenue Sidewalk Construction (SW-34)
- Campus Walk Sidewalk Construction (SW-35)
- RFLOI for CA&I Service for SW-34 & SW-35
- 2018 Sidewalk Repairs (SW-62)
- SW-75 PWOC Concrete Repairs 2019
- SW-75C Inspections for SW-75
-
Street & Thoroughfare Construction
- City Hill Plaza (ST-243)
- 2014 R. Kelly Bryant Bridge Light Repairs (ST-230)
- 2013 Old Five Points (ST-260)
- 2014 Ninth Street Streetscape
- 2015 Speed Hump Construction (ST-275)
- ST-254 Fayetteville-Buxton-Riddle Realignment
- 2013 Angier-Driver Commercial Area Streetscape
- ST-259 NCIMED Building Basement Renovations
- Inspection Services for City Projects (ST-281c)
- Duke-Gregson Curb Extensions (ST-272)
- Markham -Mangum-Roxboro Medians (ST-276)
- RFQ Design Services-Slope Stabilization (ST-294d)
- ST-294 Slope Stabilization
-
Street Repaving
- 2010 Bond Funded Repaving Projects (ST-250-253)
- 2012 Speed Humps (ST-262)
- 2013 Speed Humps (ST-267)
- 2014 Speed Humps (ST-273)
- 2014 Street Repairs & Repaving (ST-269)
- 2016 Street Repair & Repaving (ST-280)
- 2015 Street Repair & Repaving (ST-274)
- 2012 Pavement Condition Survey (ST-263)
- 2017 Speed Hump Construction (ST-284)
- 2017 Ravenstone & Stonehill Estates Paving(ST-278)
- 2018 Street Repairs & Repaving (ST-285)
-
Completed Stormwater CIP Projects
- 2020 Emergency Watershed Protection Debris Removal
- 2019 Stormwater Infrastructure Rep. (SD-2019-02)
- 2019 Stormwater Infrastructure Rep. (SD-2019-01)
- 2018 SCM Renovation & Rehabilitation SWDR-2018-01
- 2018 Carp. Flet. Rd. Culvert Stab. (SD-2018-10)
- 2018 Drainage Structure Acc. & Stab. (SD-2018-09)
- 2018 Stormwater Infrastructure Rep. (SD-2018-04)
- 2018 Trenchless Pipe Repairs (SD-2018-03)
- 2017 Stormwater Infrastructure Rep. (SD-2017-04)
- 2017 MS4 Inspections (SD-2017-03)
- 2016 Third Fork Creek Stream Rest. (SD-2016-03)
- 2015 Trenchless Pipe Repair (SD-2015-02)
- 2015 East Main St. Culvert Stab. (SD-2015-01)
- 2014 MS4 Inspections (SD-2014-01)
- 2013 Routine Ditching & Pipe Repl. (SD-2013-04)
- 2013 Third Fork Creek Stream Rest. (SD-2013-03)
- 2013 Stormwater Infrastructure Rep. (SD-2013-01)
- 2013 Stormwater BMPs Maintenance (SWM 2013-01)
- 2013 Durham Rain Catchers (10-013)
- 2012 Old N Durham Park Infrastructure Improvements
- 2012 MS4 Inspections (SD-2012-04)
- 2012 W Knox Street Culvert Stabilization
- 2012 University Drive Culvert Replacement
- 2012 Drainage Repairs & Improvements (SD-2012-01)
-
Water & Sewer System Extensions
Contact Us
-
Marvin G. Williams
Director
Email
Public Works Department
101 City Hall Plaza, Ste. 3100
Durham, NC 27701
Phone: (919) 560-4326
Fax: (919) 560-4316
Staff Directory
Service request:
Click or call 919-560-1200