Sign and Signal Shop

Rod Florence, Senior Project Manager
919-560-4197 ext. 21233

Location


320 Muldee Street Durham, NC 27703 Map

Team Members


Architect: DTW Architects
MEP: Edmonson Engineers
Structural: Ross Linden Engineers, PC
Cost Estimating Consultant: Bree and Associates
Civil: Coulter Jewel & Thames
Survey: KCI Associates
Abatement Consultants: Duncklee & Dunham
Soil Borings/Utility Locations: Terracon Consultants

Project Description


This project consists of renovating the building at 320 Muldee Street to provide operation facilities for the Transportation Department Sign and Signal Shop.

Renovation of the existing site and 20,000 square foot metal building including:
1. Demolition of all existing walls, ceilings, doors, finishes, electrical, plumbing, and ducting.
2. New metal stud and CMU walls, lay-in ceiling, and polished concrete
3. New casework, doors, and roll-up garage doors
4. New electrical, plumbing, HVAC (Trane units preferred), and low voltage systems
5. Site work including storm drainage, fencing, paving, and planting
6. Metal vehicle storage building
7. Single-ply roofing system

Photos


Sign & Signal Shop-front view

S and SS 4

Sign & Signal Shop-lot view

S and SS 5

Rendering Concepts

S and SS 1

Program Plan

S and SS 3

Aerial site view

S and SS 2

Budget


$3,589,458.00

Current Phase


Bidding

Expected Completion


June 2018