Sign and Signal Shop

Rod Florence, senior project manager
919-560-4197, ext. 21233

Location


320 Muldee Street Durham, NC 27703 Map

Team Members


Architect: DTW Architects
MEP: Edmonson Engineers
Structural: Ross Linden Engineers, PC
Cost Estimating Consultant: Bree and Associates
Civil: Coulter Jewel & Thames
Survey: KCI Associates
Abatement Consultants: Duncklee & Dunham
Soil Borings/Utility Locations: Terracon Consultants

Budget


$3,589,458

Completion


June 2018

Project Description


This project renovated the building at 320 Muldee Street to provide operation facilities for the Transportation Department Sign and Signal Shop.

Renovation of the existing site and 20,000 square foot metal building included:
1. Demolition of all existing walls, ceilings, doors, finishes, electrical, plumbing, and ducting.
2. New metal stud and CMU walls, lay-in ceiling, and polished concrete
3. New casework, doors, and roll-up garage doors
4. New electrical, plumbing, HVAC (Trane units preferred), and low voltage systems
5. Site work including storm drainage, fencing, paving, and planting
6. Metal vehicle storage building 
7. Single-ply roofing system