Campus Hills Pool Dehumidifier Replacement

Donna Maskill, Senior Project Manager  
919-560-4197, ext 21228

Location


2000 South Alston Avenue, Durham, NC  27713  Map
 

Team Members


Architect: Durable Design
Engineer: Sigma Engineered Solutions
Landscape Consultant: Coulter Jewell Thames
Contractor: Hockaday Mechanical

Project Description


Campus Hills Aquatic Center work is scheduled for the Summer 2017. Like Edison Johnson, a new dehumidification system will be installed, along with LED lighting, and painting of the interior pool natatorium space. This project is larger than Edison Johnson, with a new large concrete mechanical pad, new accessible exit ramp at the rear of the building, new interior roof drains, and improved air quality for the second floor spectator area. The project is being timed with the installation of a new roof system for the Campus Hills / I.R. Holmes Recreation Center. Previous projects had included the locker room refurbishment and the pool chemical treatment control system.



Photos


Pool view

Campus Hills Pool

Work in progress

Campus Hills before progress

Budget


$974,086.00

Current Phase


Construction
 

Expected Completion


November 2017