Street & Thoroughfare Construction

  1. City Hill Plaza (ST-243)

    The design for this project, prepared by Kimley-Horn and Associates, includes new curb and gutter, new water quality devices, sidewalks with brick pavers, streetlights and landscaping at the corner of City Hall Plaza and Mangum Street.

  2. 2013 Old Five Points (ST-260)​

    This project will construct streetscape elements at the Old Five Points intersection.

  3. 2014 Ninth Street Streetscape

    Ninth Street streetscape improvement project is a public-private redevelopment project that seeks to address infrastructure challenges along Ninth Street.

  4. 2014 R. Kelly Bryant Bridge Light Repairs (ST-230)

    The scope of this project is to replace the failed blue LED lights across the arches on both sides of the R. Kelly Bryant pedestrian bridge.

  5. 2015 Speed Hump Construction (ST-275)​

    This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of 12 speed humps and removal of five existing speed humps at various locations throughout Durham. The removal of speed humps includes but is not limited to required milling and patching, shoulder reconstruction and resurfacing of the street.