Stormwater Construction & Repairs

  1. 2013 Stormwater Infrastructure Rep. (SD-2013-01)

    The Stormwater Infrastructure Repairs and Improvements project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.

  2. 2013 Third Fork Creek Stream Rest. (SD-2013-03)

    The services for this project will include design, permitting, development of contract documents, and construction management for restoration, enhancement, creation and preservation of stream, buffer, and wetland areas in select reaches of Third Fork Creek.

  3. 2013 Routine Ditching & Pipe Repl. (SD-2013-04)

    The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of replacement storm drainage pipe and structures as well as grading of existing road side ditches within City of Durham rights of way.

  4. 2014 MS4 Inspections (SD-2014-01)

    The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.

  5. 2015 East Main St. Culvert Stab. (SD-2015-01)

    The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.

  6. 2015 Trenchless Pipe Repair (SD-2015-02)

    The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.

  7. 2016 Third Fork Creek Stream Rest. (SD-2016-03)

    The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.

  8. 2017 Stormwater Professional Services (SD-2017-01)

    The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.