North Miami Boulevard

North Miami Boulevard (between Geer Street and Raynor Street) is a road that currently varies between 2, 3, and 4 travel lanes, with parking allowed in certain sections of the corridor. The posted speed limit is 35mph. The corridor provides access to the Village Shopping Center for many surrounding neighborhoods. Additionally, Sherwood Park can be accessed via Juniper Street.

 The proposed restriping will provide a more consistent cross-section, and allow for bicycle facilities along the entirety of the corridor. It will also help slow traffic speeds. Parking is expected to be retained along most of the corridor. 

Cross-sections of the proposed changes are below, and the full design can be viewed here

Comments received during the September public meeting and online comment period are being reviewed and, if possible, incorporated. When complete, the final designs will be shared on this page.

The re-striping work is estimated to occur in Summer 2019.

CutSheet_MiamiBlvd