Adding bicycle facilities on Lakewood Avenue between Fayetteville Street and Duke Street will connect the proposed bicycle facilities on Fayetteville Street and the existing bicycle lanes on Blackwell Street and University Drive, as well as improve access to the American Tobacco Trail. 

The pavement width along this corridor varies between 27 and 44 feet. No changes to the existing curb are proposed as part of this project.

The proposed improvements can be seen below, and the full design here.

Comments received during the September public meeting and online comment period are being reviewed and, if possible, incorporated. When complete, the final designs will be shared on this page.

The re-striping work is estimated to occur in Summer 2019.


Lakewood Cutsheet 8.1.2018