Campus Hills Pool Dehumidifier Replacement

Donna Maskill, Senior Project Manager
919-560-4197, ext. 21228

Location


2000 South Alston Avenue, Durham, NC 27707 Map

Team Members


Architect: Durable Design
Engineer: Sigma Engineered Solutions
Landscape Consultant: Coulter Jewell Thames
Contractor: Hockaday Mechanical

Project Description


At Campus Hills Aquatic Center a new dehumidification system was installed, along with LED lighting and painting of the interior pool natatorium space. This project involved creating a new large concrete mechanical pad, new accessible exit ramp for the rear of the building, new interior roof drains, and improved air quality for the second floor spectator area. The project was timed with the installation of the new roof system for the recreation center. Previous projects had included the locker room refurbishment and the pool chemical treatment control system.

Photos

Low-level bench exhaust

Campus Hills after pic

Fabric duct and LED lights

Campus Hills Fabric Duct LED lights

Dehumidifier unit

Campus Hills pool exterior

Budget


$974,086.00

Completion


October 2017